Project Overview

G&B Civil Engineering is proud to have completed the restoration of the historic footbridge at Cullercoats Metro Station. Originally built in 1882, this project required a delicate balance of heritage preservation and modern safety standards to breathe new life into this iconic structure while ensuring its durability for future generations.

Client:

Nexus

Project Value:

£579,000

Completion Date:

April 2024

Looking for your next provider?

Get In Touch

Restoring the Historic Cullercoats Metro Footbridge

Scope of Works

Our team undertook a comprehensive restoration, addressing structural integrity, aesthetic preservation, and anti-vandal measures. The scope included:

  • Intricate Scaffolding Installation: Positioned safely around the live overhead line, ensuring uninterrupted rail services.
  • Structural Steelwork Repairs: Strengthened and replaced critical components to enhance the bridge’s stability.
  • Timber Framework Restoration: Returned the original timber elements to their former glory.
  • Cladding Replacement: Replaced deteriorated timber cladding with durable, anti-vandal Glass-Reinforced Plastic (GRP).
  • Window Installation: Fitted robust polycarbonate glazing for enhanced safety and aesthetics.
  • Protective Steel Coating: Grit blasted and re-coated structural steelwork for long-term protection against environmental wear.
  • Heritage Colours: Restored the bridge to its original Victorian-era colours of brown and yellow.

Challenges and Solutions

  • Heritage Constraints: Preservation of historical features was paramount. We collaborated closely with consultants and specialists to ensure that all restorations adhered to heritage guidelines.
  • Live Environment: Working within a live rail environment posed significant safety challenges. Our team employed detailed planning and coordination with partners to maintain safety and avoid service disruptions.
  • Material Durability: The use of GRP and polycarbonate ensured the structure met modern standards for resilience and vandal resistance.

Outcome

The restored footbridge at Cullercoats Metro Station stands as a testament to our ability to deliver complex heritage restoration projects while meeting contemporary safety and functionality standards.

Collaborations

This project was made possible through close collaboration with:

  • Dart Industrial Services Limited
  • Smyth Composites Limited
  • Interlink Scaffolding Ltd.
  • MHB Consultants Ltd
  • Thirlaway Project Management Ltd

Conclusion

This successful project highlights G&B Civil Engineering’s expertise in heritage restoration and infrastructure improvement. We are proud to have revitalised a historic landmark, ensuring its legacy endures for generations to come.

Gallery

No items found.

If you’re looking for a service provider you can rely on, get in touch

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.